Case study · Product launch · East Palo Alto, CA · 2026

Stage design and AV for Dreame’s launch in Silicon Valley

Published

Dreame, the Chinese home-appliance maker, launched its 2026 line in Silicon Valley with an evening at the Four Seasons in East Palo Alto. We designed the room in 3D, built the LED wall, sound and show control in the ballroom, and ran the launch live. Two of our engineers ran the whole launch: one on video, one on sound.

January 27, 2026: show control, with the launch title on the wall
January 27, 2026: show control, with the launch title on the wall

At a glance

Event
Dreame 2026 Home Appliance Launch, “Silicon Valley Gathering”
Venue
Four Seasons Hotel, East Palo Alto, CA
Date
January 27, 2026
Our part
3D renders and room layout; LED, sound and show control, run on the night
LED
5 × 3.5 m, P2.6 at 7680 Hz, 70 cabinets, ground-stacked; 5 × 3.25 m visible above the stage
Video
NovaStar MX40 Pro over fiber; PixelHue 4K switcher and U5 console; Hirender S3, main and backup; confidence monitor
Sound
8 single-10 line-array cabinets, 2 subwoofers, digital mixer, 4 wireless microphones
Power
Our own 200 A, 208 V three-phase distribution
Crew
Build and strike crew; on the night, one video engineer and one audio engineer

For Dreame’s 2026 Home Appliance Launch, the “Silicon Valley Gathering” on January 27, 2026 at the Four Seasons Hotel in East Palo Alto, PixelPro Productions designed the room in 3D, drew the ballroom layout, and supplied and ran the LED wall, sound and show control. The wall is 5 × 3.5 m of P2.6 LED at 7680 Hz, 70 cabinets ground-stacked behind the stage, with 5 × 3.25 m showing above the 30 cm stage, on a NovaStar MX40 Pro over fiber, switched on a PixelHue 4K switcher and U5 console, with Hirender S3 media servers running main and backup. Sound was eight single-10 line-array cabinets, two subwoofers, a digital mixer and four wireless microphones, on our own 200 A three-phase distribution. On the night one video engineer and one audio engineer ran the show. We were hired through an agency.

Our 3D render at the design stage, with its dimensions
Our 3D render at the design stage, with its dimensions

The brief

Dreame wanted a stage presentation in a hotel ballroom, with its product line on display along one side of the room. We were hired through an agency.

Load-in and the launch were on the same day, so the plan had to be settled before load-in.

Have a project in mind? Send us the details, or call.

How we planned it 01

The room, drawn in 3D first

We drew the launch in 3D before booking a truck: the wall, its size against the stage and the speakers either side, then the product display area along the far wall.

With the renders we drew the ballroom layout to scale: where the LED and the stage sit, the speaker positions, the rows of seats and the display zone.

Nothing on the day that had not been drawn first.

Our 3D render at the design stage, with its dimensions
Our 3D render at the design stage, with its dimensions
Our ballroom layout: LED and stage, speakers, seating, display zone
Our ballroom layout: LED and stage, speakers, seating, display zone

How we planned it 02

Built on the day

The wall went up ground-stacked behind the client’s 30 cm stage, on H-frames with ground bars and ballast, so the part above the stage shows as drawn.

The line arrays and subwoofers went in either side of the stage, on our own three-phase power for the LED and sound.

Built, tested and lit before the doors opened.

The ballroom set, the wall lit before doors
The ballroom set, the wall lit before doors
The same room in our render
The same room in our render

How we planned it 03

Two engineers ran the launch

A launch moves on cues: the title, each product, each speaker. Our video engineer ran the content from the media servers, main and backup, with a confidence monitor for the presenters.

Our audio engineer ran the line arrays and the wireless microphones.

One on video, one on sound.

Our render of the product display along the far wall
Our render of the product display along the far wall

The result

  • The room matched our drawings, and the launch ran live from the first cue to the last.

How we run LED, sound and crew for launches is on our event AV production page.

Questions about product launches

Do you design the room before a product launch?

Yes. For Dreame’s 2026 Home Appliance Launch in East Palo Alto, PixelPro drew the room in 3D and laid out the ballroom to scale, with the LED wall, stage, speakers, seating and product display.

Who runs the screens and sound during a product launch?

Our engineers. At Dreame’s 2026 launch in East Palo Alto one PixelPro video engineer ran the Hirender S3 media servers, main and backup, through a PixelHue 4K switcher and U5 console, and one audio engineer ran the line arrays and four wireless microphones.

Can an LED wall stand behind a stage?

Yes. At Dreame’s 2026 launch PixelPro ground-stacked a 5 × 3.5 m P2.6 wall of 70 cabinets behind the client’s 30 cm stage, on H-frames with ground bars and ballast, so 5 × 3.25 m showed above the stage, matching the 3D render.